Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe

  • Audited Supplier
  • 3 yrs

Contact Supplier

Still deciding? Get samples of $ !
Request Sample

Product Highlights

  • Direct Buried Design: No support needed, eliminates thermal bridges, suitable for ground or water burial.
  • High Strength & Toughness: Easy welding and convenient construction with strong waterproof and corrosion resistance.
  • Low Thermal Conductivity: Excellent insulation with 0.029 W/(M.K) conductivity, saving energy and materials.
  • Customizable Specifications: Supports customization in material, specification, logo, package, and connection methods.
  • Advanced Production Process: One-step and two-step methods ensure uniform foam density and consistent insulation thickness.
  • Chemical Resistance: Polyurethane foam offers high resistance to chemicals and protects pipes from damage.
  • Flexible Connection: Easy connection options including flange and quick joint connections.

Product Images of Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe

Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe pictures & photos
Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe pictures & photos
Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe pictures & photos
Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe pictures & photos
Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe pictures & photos
Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
  • Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
  • Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
    Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
  • Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
    Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
  • Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
    Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
  • Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
    Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
  • Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
    Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe

Find Similar Products

Product Description

Product Description

Polyurethane-foam tubing is most often used to insulate central heating and domestic-water pipelines. This material is resistant in the temperature range -50°C to 135°C, and has a low heat-transfer coefficient. Such a thermal insulator is rigid, and perfectly protects pipes from damage. Tubing made of polyurethane foam is distinguished by its high level of resistance to chemicals. It comes in a soft, hard, and super-hard versions.We have different production processes.
 
Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe

1.One-step method.
Rigid polyurethane spray polyethylene wrapped prefabricated direct-buried insulation pipe adopts advanced polyurethane spray polyethylene winding online forming technology, which improves the uniformity of foam density and consistency of insulation layer thickness, saves materials, reduces labor costs, and is suitable for Transport hot water with a temperature not higher than 140°C.

Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
2.The two-step method.
Using a no bracket foaming patform.Compared with the traditional two-step method of insulation pipe,to avoid the emergence of the "bracket thermal brige" prolem,the axis eccentricity is small,to ensure the long-term temperature resistance of the insulation pipe.

Product Parameters

Working Steel Pipe Diameter mm Outer Sheath Diameter mm Minimum thickness of outer sheath mm  Insulation layer thickness mm
426 494-554 4.0 30-60
478 547-607 4.5 30-60
529 598-658 4.5 30-60
630 700-760 5.0 30-60
720 790-850 5.0 30-60
820 891-951 5.5 30-60
920 992-1052 6.0 30-60
1020 1093-1153 6.5 30-60
1120 1194-1254 7.0 30-60
1220 1316-1436 8.0 40-100
1420 1538-1678 9.0 50-120
1620 1760-1880 10.0 60-120
1820 1960-2080 10.0 60-120
Note: can be customized as customer's needs.

Connection Method

Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe

Appliation Cases

Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe

Our Advantages

Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
1. There is no need for support, less heat loss, and the phenomenon of "support thermal bridge" completely disappears;
2. High strength, good toughness, easy welding, convenient construction;
3. Low thermal conductivity, with strong waterproof and corrosion resistance, can be directly buried in the ground or water;
4. Easy connection, can be used flange, quick joint connection;
5. Long service life, can be used in -20ºC ~ 120ºC environment for more than 30 years.

Company Profile

Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
Shandong Donghong Pipe Industry Co., Ltd. (referred to as: Donghong Co., Ltd., stock code: 603856) is headquartered in Qufu, China, the hometown of Confucius.Is an engineering pipeline manufacturer, pipeline engineering service provider and pipeline engineering general contractor with the main business of four categories of functional and customized pipelines: special pipelines for rainwater and sewage diversion, special pipelines for municipal areas, special pipelines for industrial and mining areas, and special pipelines for national key engineering projects. The company has built up an industrial ecosystem with the participation of design institutes, financial institutions,  port logistics, construction units, upstream and downstream enterprises, etc. The company is committed to becoming a global leading pipeline system comprehensive solution provider by making intelligent pipelines change human life and constant safety of pipeline transportation.

 
Donghong has more than 200 R&D personnel and more than 100 patents. Relying on national enterprise technology  center, national CNAS laboratory, academician expert workstation, post-doctoral workstation and other national technology R&D platforms, Donghong deepens the research on digitalization, informatization and intelligentization of pipeline engineering and leads the development of engineering pipeline industry.
 
Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe
 

Certifications

Underground Direct Buried Pre Insulated Foam and HDPE Casing Steel Pipe

FAQ

1. Is your product meets the international standard ?
Our products have pass CE, BV, ISO and wars certificate, and all figures indicates higher than standard, you can feel free to let us know which national standard you required, we will check or test it for you.

2. What kind of service do you offer ?
As a manufacture fatory, we provide pipe products, pipe fittings, package and shipping; as a professional consulation company we provide project consulting advise, pipe system solutions and design suggestions; as an engineering focused enterprise , we also provide pipeline contractor service and pipe repair service, also can give free maintance guidance.

3. Do you support OEM/ODM service?
Yes, we offer customization in material, specification, logo, package , connection methods andothers. Meanwhile, our professional team can offer solution suggestion for your specified projects, we have successfull cases of that service.

4. What's your terms of payment?
T/T or L/C at sight.

5. How can you gurantee the goods you offered is qualified?
We warmly welcome all customers arrange the visit to our company and see our goods in sight, we can also provide strict test as per customer required before order. Meanwhile, before the bulk production, we can dispatch samples for customer to do their own tests to qualify the products.

About the Supplier

This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASI245429". Items marked "verified" are certified.

Watch Video
Watch Video
Shandong Donghong Pipe Industry Co., Ltd.
Shandong Donghong Pipe Industry Co., Ltd.
Shandong Donghong Pipe Industry Co., Ltd.
Shandong Donghong Pipe Industry Co., Ltd.
Shandong Donghong Pipe Industry Co., Ltd.
Shandong Donghong Pipe Industry Co., Ltd.
Shandong Donghong Pipe Industry Co., Ltd.
Shandong Donghong Pipe Industry Co., Ltd.

About Our Factory & Business Background

verified Business Type
Manufacturer/Factory & Trading Company
Address
No. 1 Donghong Road, Qufu City, Jining, Shandong, China
verified Plant Area
60000 square meters
verified Number of Employees
1687
verified Registered Capital
256,900,600 RMB
verified Terms of Payment
LC, T/T, D/P, PayPal, Western Union, Small-amount payment
verified International Commercial Terms(Incoterms)
FOB, CIF, CFR, EXW
verified Average Lead Time
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
verified Nearest Port
Qingdao Port
verified Minimum Order Quantity
1
verified Supply Chain Partners
73

Our Production Capability & Technical Expertise

verified Main Products
Steel wire reinforced PE composite pipe, HDPE pipe, PE pipe, steel pipe
verified Production Lines
300
verified Production Machines
Mixing machine, HDPE pipe production line, Steel wire reinforced PE composite pipe production line, Steel pipe production line
verified QA/QC inspectors
32 people
verified Inspection Type for Finished Products
100% inspection(Visual inspection & Function inspection)
verified Inspection Method for Finished Products
Have instructions and uniformly followed
verified Customization Options
Customization from Samples, Customization from Designs, Full Customization, Minor Customization, Flexible customization
verified ODM Service Available
Yes
verified OEM Service Available
Yes
verified R&D Engineers
66 people
verified Traceability of Raw Materials
Yes
verified Test Reports for Raw Materials
Others
verified Own Brand
Yes

Our Industry Experience & Global Business Record

verified Year of Establishment
2008-01-21
verified Export Year
16 Years
verified Main Markets
Southeast Asia/ Mideast, East Asia(Japan/ South Korea), Australia, Domestic
verified Repeat Buyers Choice
80%~100%
verified Number of Foreign Trading Staff
5
verified Overseas Agent/Branch
No
verified New Products Launched in Last year
Yes

Our Certifications, Standards & Industry Recognition

verified Product Certification
CE, Others
verified Cooperated with Fortune 500
Yes

FAQ

Does your product meet international standards?
Our products have passed CE, BV, ISO, and wars certificates, with all figures indicating higher than standard. We can check or test for any specific national standard you require.
What services do you offer?
As a manufacturer, we provide pipe products, fittings, packaging, and shipping. As a consulting company, we offer project advice, system solutions, and design suggestions. We also provide pipeline contractor and repair services, along with free maintenance guidance.
Do you support OEM/ODM service?
Yes, we offer customization in material, specification, logo, package, and connection methods. Our professional team can also provide solution suggestions for your specified projects with successful case history.
What are your terms of payment?
We accept T/T or L/C at sight.
How do you guarantee product quality?
We welcome customers to visit our company and inspect goods. We provide strict testing per customer requirements before orders and dispatch samples for customer testing before bulk production.
What is the minimum order quantity?
The minimum order quantity is 1.
What is the lead time for production?
The average lead time is within 15 workdays for both peak and off-season periods.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now