Using a no bracket foaming platform.Compard with the traditional Two-step method of insulation pipe,to avoid the emergence of the "baracket thermal brige" problem,the axis eccentricity is small,to ensure the long-term temperature resistance of the insulation pipe.
The outer protective layer is mainly made of high-strength and high-toughness polyethylene material, and adopts the company's core polyethylene modification technology, which polarizes the surface of polyethylene and greatly improves its adhesion performance with polyurethane.
Working Steel Pipe Diameter mm |
Outer Sheath Diameter mm |
Minimum thickness of outer sheath mm |
Insulation layer thickness mm |
426 |
494-554 |
4.0 |
30-60 |
478 |
547-607 |
4.5 |
30-60 |
529 |
598-658 |
4.5 |
30-60 |
630 |
700-760 |
5.0 |
30-60 |
720 |
790-850 |
5.0 |
30-60 |
820 |
891-951 |
5.5 |
30-60 |
920 |
992-1052 |
6.0 |
30-60 |
1020 |
1093-1153 |
6.5 |
30-60 |
1120 |
1194-1254 |
7.0 |
30-60 |
1220 |
1316-1436 |
8.0 |
40-100 |
1420 |
1538-1678 |
9.0 |
50-120 |
1620 |
1760-1880 |
10.0 |
60-120 |
1820 |
1960-2080 |
10.0 |
60-120 |
Note: can be customized as customer's needs. |
The company introduces the most advanced pipe insulation production equipment for fully automatic two-step pipe insulation production line 4, including 600kg/minute injection volume of high-pressure foaming machine, independent descaling equipment, no bracket foaming platform, the outer sheath pipe production line capacity of 4 tons per hour.
Our company's two-step pipe insulation production process and supply capacity can be up to the industry's first, fully automated insulation production line, only the upper and lower pipe for hanging pipe, other processes are automatic beat control, high product consistency.
1. There is no need for support, less heat loss, and the phenomenon of "support thermal bridge" completely disappears;
2. High strength, good toughness, easy welding, convenient construction;
3. Low thermal conductivity, with strong waterproof and corrosion resistance, can be directly buried in the ground or water;
4. Easy connection, can be used flange, quick joint connection;
5. Long service life, can be used in -20ºC ~ 120ºC environment for more than 30 years.
Insulation steel pipes are used in liauid and gas transmission pipe insulation projects in petroleum,chemical,central heating and heating networks,central air-conditioning ventilation pipes,and municipal engneering.High-temperature prefabricated direct-buried thermal insulation steel pipe is a direct-buried prefabricated thermal insulation steel pipe with good thermal insulation performance,safety and reliabllity,and low construction cost.
Shandong Donghong Pipe Industry Co., Ltd. (referred to as: Donghong Co., Ltd., stock code: 603856) is headquartered in Qufu, China, the hometown of Confucius.Is an engineering pipeline manufacturer, pipeline engineering service provider and pipeline engineering general contractor with the main business of four categories of functional and customized pipelines: special pipelines for rainwater and sewage diversion, special pipelines for municipal areas, special pipelines for industrial and mining areas, and special pipelines for national key engineering projects. The company has built up an industrial ecosystem with the participation of design institutes, financial institutions, port logistics, construction units, upstream and downstream enterprises, etc. The company is committed to becoming a global leading pipeline system comprehensive solution provider by making intelligent pipelines change human life and constant safety of pipeline transportation.
Donghong has more than 200 R&D personnel and more than 100 patents. Relying on national enterprise technology center, national CNAS laboratory, academician expert workstation, post-doctoral workstation and other national technology R&D platforms, Donghong deepens the research on digitalization, informatization and intelligentization of pipeline engineering and leads the development of engineering pipeline industry.
Donghong was listed on the main board of Shanghai in November 2017, becoming the first main board-listed company in China's engineered composite piping system.
Relying on national technology research and development platforms such as National Enterprise Technology Center, National CNAS Laboratory, Academician Expert Workstation, Post-doctoral Workstation, etc., Donghong deepens the research on the digitization, informatization and intelligence of pipeline engineering, leads the development of engineering pipeline industry, and serves the national key strategic projects and people's livelihood projects, such as South-to-North Water Diversion, Huangzhilin, Hanzhiwei, Beijing-New Zealand Expressway, One Belt, One Road, "Two Clear and One Tip", standardized farmland, urban and rural water supply integration, Liren gas, centralized heat supply, etc. The company has been engaged in national key strategic projects and people's livelihood projects.
Excellent technical research and development capability.
We have a national CNAS laboratory, introduce advanced test equipment, cooperate with the development of new products, new materials, new types of connections, and rigorous testing of our own products to ensure stable and reliable product quality.
Donghong has established strategic partnerships with more than 5 5A-level logistics companies, and we have many years of transportation experience. Combining automobile transportation, railway transportation, port and shipping logistics, etc., no matter the heat or cold, no matter the area is remote or harsh, we can provide you with the best service. We have a comprehensive transportation strategy to ensure that every shipment is delivered to the customer site as soon as possible.
1. Is your product meets the international standard ?
Our products have pass CE, BV, ISO and wars certificate, and all figures indicates higher than standard, you can feel free to let us know which national standard you required, we will check or test it for you.
2. What kind of service do you offer ?
As a manufacture fatory, we provide pipe products, pipe fittings, package and shipping; as a professional consulation company we provide project consulting advise, pipe system solutions and design suggestions; as an engineering focused enterprise , we also provide pipeline contractor service and pipe repair service, also can give free maintance guidance.
3. Do you support OEM/ODM service?
Yes, we offer customization in material, specification, logo, package , connection methods andothers. Meanwhile, our professional team can offer solution suggestion for your specified projects, we have successfull cases of that service.
4. What's your terms of payment?
T/T or L/C at sight.
5. How can you gurantee the goods you offered is qualified?
We warmly welcome all customers arrange the visit to our company and see our goods in sight, we can also provide strict test as per customer required before order. Meanwhile, before the bulk production, we can dispatch samples for customer to do their own tests to qualify the products.